Dam / inundation: Risk (Map, grade 9)
Instructional activity in a Dam / inundation context. Goal: Performs risk analysis. Action-focused, without fear.
What will you learn in this game?
Performs risk analysis. Analyzes and evaluates disaster risks.
How to use it in class?
Reserve 10–15 minutes at the end of the lesson so students can play individually or in pairs, then discuss the results together. Focus: reinforcing the learning outcome "Performs risk analysis" with real-life examples.
Can heard a siren at the picnic: move to higher ground. Where should he go?
Use the sketch to see locations; click a point or the option on the right, or press Enter/Space.